Home Products Literature CAD Details Contact Gallery News Ordering Accreditations
Ward Insulated Panels
DR1000 : Verge Details
Select Other Verge Details..


Construction Details - Low Pitch Roof Above 1°

Download
(right click)

Construction Details - Low Pitch Roof Above 1° The verge flashing is attached to the sidewall cladding by the use of rivets or stitching screws at 400mm centres. If the wall cladding is profiled a filler must be used at this junction to prevent ingress into the construction. An apex flashing unit is available to suit roof slopes between 2° and 18°. The apex flashing TR10 overlays this unit and is sealed using filler F2TR10MP at the end of the ridge flashing. To form the basis of support for the flashings at this junction, the apex filler support zed is butted and sealed to the verge support VFS 1. A clearance notch is required in the verge apex flashing unit to provide full length support to the ridge capping.